Supervised plants
| Mining plants / other plants or organizational units | No. | Employment - direct employees (as on 31.12.2025) |
Output in 2025 | |
|---|---|---|---|---|
|
1. |
Underground: |
27 | 78 187 | |
| hard coal | 18(1) | 65 017 | 42 701,2 thousand tons (2) | |
| hard coal (in liquidation) | 1 | 8 | - | |
| hard coal under construction | 1 | 10 | - | |
| copper ore | 3 | 12 287 | 31 971,3 thousand tons | |
| zink and lead ore (in liquidation) | 1 | 10 | - | |
| salt | 1 | 763 | 714,1 thousand tons (3) | |
| gypsum and anhydrite | 1 | 75 | 133,4 thousand tons | |
| extracting curative brine | 1 | 17 | 500 m3 | |
|
2.
|
Plants conducting activities described in Article 2(1) of the Geological and Mining Law |
21(4) | 2 131 | - |
|
Including plants performing tunnelling |
2 | 62 | - | |
|
3. |
Surface: |
7 307 | 25 653 | |
|
- covered by the mining ownership |
10 | 4 298 | N/D | |
| lignite | 5(5) | 4 207 | 37 234,2 thousand tons | |
| other | 5 | 91 | N/D | |
|
- covered by the property rights in land |
7 297(6) | 21 355 | N/D | |
|
4.
|
Drilling: |
108 | 3 516 | |
| oil and gas | 9(7) | 2 577 | 832 thousand tones + 4,644 billion m3 | |
| salt | 2(8) | 99 | 2 036,0 thousand tons | |
| sulphur | 2 | 340 | 445,6 thousand tons | |
| therapeutic and thermal waters and brines | 85 | 387 | 16 788 thousand m3 | |
| methane from seams | 7 | 36 | 23 931,1 thousand m3 | |
| underground gas storage | 2(9) | 77 | - | |
| underground storage of waste in closure | 1 | 0 | - | |
| 5. | Plants conducting geological works as described in Article 86 of the Geological and Mining Law | 217 | 2 606(10) | - |
| TOTAL EMPLOYMENT (own team together) | 112 093 | - | ||
| 6. | Branches of entities conducting professional activities entrusted to them in mining or plant operations | 4172(11) | 48 769 | - |
| EMPLOYMENT IN TOTAL (own team together with third sector players) | 160 862 |
- |
||
- 18 mining plants extracting hard coal in 26 operations.
- Source: State Mining Authority.
- Including salt output from KGHM Polska Miedź S.A. “Polkowice-Sieroszowice” mining plant.
- Including Central Drainage Plant (CZOK).
- 5 brown coal mining plants (including 5 operating open pits and 6 open pits in liquidation).
- All stages of mining activities (plants conducting operational activity, before the start of mining operation, halted, abandoned, in the process of closure or reclamation).
- The number provided includes: 2 mining plants extracting minerals from maritime areas of the Republic of Poland, 2 mining plants functioning as branches of Orlen S.A., which are the Upstream Polska Sanok and Upstream Polska Zielona Góra Branches (which all in all include 50 oil or natural gas mines and 7 underground gas storage facilities including 2 underground storage facilities in Sanok Branch for high nitrogen natural gas storage functioning outside the national natural gas grid), and 5 mining plants functioning in the structures of other entities.
- Including 1 in closure; there are 2 mines functioning within mining plant IKS “Solino”, i.e. Salt Mine and Underground Oil and Fuel Storage Facility “Góra” and Salt Mine “Mogilno”.
- 2 Cavern Underground Gas Storage Facilities (CUGS “Mogilno”, and CUGS “Kosakowo” in expansion).
- Because of their peculiarity plants conducting geological works can act within territorial competence of a number of district mining office (increased number of employees).
- The number of branches of entities may be overestimated due to repeatability of services provided to a number of mining or other plants, which are mentioned in Article 2(1) and Article 86 of the Geological and Mining Law.