The investment process for rooftop wind systems with a height not exceeding 3 meters is maximally simplified. In the case of on-grid systems, only the notification of connection of the micro-system to the grid (or obtaining conditions for connection) is required.
A rooftop wind turbine exceeding 3 meters in height, with an installed capacity not exceeding 50 kW, additionally requires the submission of a notification of construction works.