List of Administrative Procedures

Below is a list of procedures that may be required in the investment–construction process of your RES installation. Review the information about them, keeping in mind that they are most often presented in a general manner, without referring exclusively to renewable energy investments (you will find those details in the Handbook of RES Investment Procedures). The procedures indicated here are also not organized according to a specific RES technology, but have been divided into thematic sections.

Environmental procedures

Decision on Environmental Conditions

Permit under the Water Legislation

Notification under the Water Legislation

Assessment under the Water Legislation

Integrated Permit

Permit to Release Gases or Particulate Matter into the Air

Permit to Discharge Sewage Into Water or Soil

Waste Processing Permit

Waste Generation Permit

Management of Digestate

Spatial planning procedures

Decision on the Location of a Public Purpose Investment

Decision on Land Development Conditions

Resolution on the Determination of the Location of an Agricultural Biogas Plant

Application for an Extract and Drawing from the Local Spatial Development Plan (MPZP)

Application for an excerpt and extract from the Study of Conditions and Directions of Spatial

Certificate of Compliance of the Intended Use of a Building With the Provisions of the Applicable Local Spatial Development Plan (MPZP)

Certificate of Compliance of Construction With the Provisions of the Applicable Local Spatial Development Plan (MPZP)

Local Spatial Development Plan (MPZP) and Procedures for Its Adoption

Exclusion of Land from Agricultural Production

Grid connection procedures

Micro-system Notification

Application for Issuance of Conditions for Connection to the Heating Grid

Application for Issuance of Conditions for Connection to the Electricity Grid

Application for Issuance of Conditions for Connection to the Gas Grid

Construction procedures

Construction permit

Notification of Construction with a Building Design

Notification of construction or construction works without a building design

Operational notification

Notification on Completion of Construction Works

Notification to the State Fire Service of the completion of construction

Notification to the State Sanitary Inspection of the Completion of Construction

Geological procedures

Approval of a Mine Operation Plan

Notification of the Commencement of Geological Works

Preparation of Hydrogeological Documentation After Completion of Geological Works Related to Groundwater

Approval of Hydrogeological Documentation

Geological Information

Thermal Water Extraction Licence

Approval of the Design of Geological Works

Preparation and Submission of Other Geological Documentation

Procedures – offshore wind farms

Permit decision for the erection or use of artificial islands, structures and equipment in Polish maritime areas

Permit to install and maintain cables within internal sea waters and the territorial sea and approval for installation and maintenance of cables in the exclusive economic zone

Decisions approving expert assessments and plans concerning maritime navigation safety, personnel safety, and marine environmental protection

Decisions approving expert assessments in the field of communication systems, maritime safety, protection of the state border at sea, and national defence

Expert opinion on design and workmanship conformity submitted to the transmission system operator

Certification of offshore wind farms and the set of equipment for power evacuation

Verification of location possibilities in the Spatial Development Plan for Internal Sea Waters, Territorial Sea and Exclusive Economic Zone (PZPPOM) and Annexes 1 and 2 to the Act on Promoting Electricity Generation in Offshore Wind Farms (u.p.m.f.w.)

Decision on the approval of geological documentation for an offshore wind farm

Procedures - Entries into Registers/Reporting

Entry in the Register of Bioliquid Producers

Entry in the Register of Agricultural Biogas Producers

Entry in the Register of Biogas Producers

Entry in the Register of Electricity Storage Facilities

Entry in the Register of Small RES Electricity Generators

Report by a Small Installation Energy Producer

Licensing procedures

Licence for the Generation of Electricity from Renewable Energy Sources (RES)

Licence for Electricity Generation in Cogeneration (CHP)

Licence for Heat Generation (WCC)

Licence for Electricity Storage

Other procedures

Securing Legal Title to Property

Application for the Conclusion of a Land Use Agreement for Land Under Flowing Inland Waters

Reporting Air Navigation Obstacles

Registration of a Heat Pump in the Central Register of Operators (CRO)

Reporting to the Central Register of Building Emissions (CEEB)

Consultation of the Installation Design with a Fire Protection Expert Regarding Compliance with Fire Safety Regulations

Certificate of Admission to Auction

Notification to the State Fire Service (PSP) upon Completion of Construction

 